the barbican

SCHOOL FOR SCANDAL

The main feature show for May and June 2011 at The Barbican, London was a production of Sheridan’s restoration comedy ‘School for Scandal’. Due to a successful and longstanding professional relationship with Factory Settings, Rutters were commissioned to supply printed graphics for this prestigious event.

A series of very large canvas prints were produced, some of which were hung as cloths and some as wallpaper to the walls. Totalling nearly 250 square metres, the flats for the large scenic drops were printed on Digital canvas and the wall flats printed onto self adhesive material with anti slip surfaces. The latter were expertly mounted onto timber flats prepared by Factory Settings as walls which were then lowered on stage to become floors.